Talk:Floating Dome Biodigestor

From OHO - search engine for sustainable open hardware projects

Part number C1 -- Jeefri (talk) 03:25, 13 December 2021 (CET)

• Consider eliminating empty rows.

• Consider adding relevant information regarding the operation of the project.

• Remove C3 sheet from PDF file.

Part number 3.6 -- Jeefri (talk) 03:25, 13 December 2021 (CET)

• Indicate smaller diameter.

• Indicate weld at joint.

-- Jaimerosciano (talk) 15:29, 22 December 2021 (CET)

It is recommended that the fluid entering the biodigester is done from the top of the large tank, so that the force of gravity favors and avoids the effort for clogging.

  • It is recommended to place a rubber washer around the biodigester to act as an odor seal.

Part number A1 -- Jaimerosciano (talk) 15:30, 22 December 2021 (CET)

Page 2 place drawing scale

Part number B1 -- Jaimerosciano (talk) 15:32, 22 December 2021 (CET)

It is recommended to number the items first the production items and then the standard items for better visual order when reading the drawings.

  • Place dimensions only in specifications.